Testing and Commissioning Procedure for FM200 System (REDCO) fHARDCOPY DISTRIBUTION LIST This document is not controlled when printed. All the above shall be conducted in close coordination with the quality department to monitor any deviations from the Quality Management System requirement and induce corrective actions whenever required to eliminate non-conformance or quality deviations. Apply detector test liquid on the detector and check following sequence. Inspect all FM-200 bottle pressure operated control heads for damage, corrosion, cracks, cleanliness, and if loose. Fill the integrity test record form except the readings to be taken during the test. All persons who could be expected to inspect, test, maintain, or operate fire systems shall be thoroughly trained. 0000000016 00000 n
Where obstructed/clogged, remedial action must be completed immediately. To help ensure your fire suppression system remains compliant with the latest regulations, Johnson Controls is offering a full Hydrostatic Test Service (H-Testing) for FM-200, SAPPHIRE , CO2 and INERT gas containers that have been in service for 10 years. The following information should be documented on a tag and attached to the bottle: Where measured weight shows a loss of 5% of the original charge weight, replace the cylinder in line with the manufacturers requirements. ?C0av}` +C44nuaaoum3b? Activate the system via pushing the manual emergency activation button. 3. The competent person must be assigned to the project/work to be undertaken. 10. In the SAT procedure, the equipment system goes through actual production, following all process parameters, and verifying its working conditions. Methodology 0000001962 00000 n
trailer
<<
/Size 325
/Info 281 0 R
/Root 286 0 R
/Prev 213712
/ID[<3146ca08dc7ccf0747704d1c6e5dc21b><44923aeebec01018334b2aaa602c644b>]
>>
startxref
0
%%EOF
286 0 obj
<<
/Type /Catalog
/Pages 280 0 R
/Metadata 282 0 R
/AcroForm 287 0 R
>>
endobj
287 0 obj
<<
/Fields [ ]
/DR << /Font << /ZaDb 277 0 R /Helv 278 0 R >> /Encoding << /PDFDocEncoding 279 0 R >> >>
/DA (/Helv 0 Tf 0 g )
>>
endobj
323 0 obj
<< /S 285 /V 384 /Filter /FlateDecode /Length 324 0 R >>
stream
Manual Release-At least one manual release push button shall be provided external to the protected enclosure and mounted within 1.5 m of the main entrance. The procedure applies for the installation, testing and commissioning of 200 Bar Clean Agent INERGEN gas fire extinguishing system in at the project. The inspection and testing program should include passive fire protection systems in the plan. To start a fire, there are three main elements required, oxygen, heat, and fuel which is generally termed as a fire triangle. The testing and commissioning procedures shall be in compliance with Specification and applicable NFPA standard. Chemicals or mixtures of chemicals that rapidly oxidize in the absence of air. OFMR shall establish and maintain an The material shall be used after being approved through Material Submittals. Check all the supports properly installed. The contractor shall consult the public utility authorities not less than one month before it is proposed to commence work to ascertain whether any underground installations will be affected by the proposed work, in which event the contractor shall make all necessary arrangements with the public utility authorities to safeguard the installation. These inert gases suppress fire by lowering the oxygen in the space to below that required for combustion. Pipes size DN 50 and smaller will have threaded joints as per specification and approved materials. The Quality Control requirement shall include related ITPs and other related documents as applicable. www.qaqcconstruction.com recommends this! NFPA members and public sector officials may submit a question on an NFPA code or standard. FM 200 provides protection equal to that of Halon 1301 and testing has proved that FM200 is effective. will be inspected prior to use to make sure they comply with the site safety requirements. Moreover, the physical condition of the material shall be checked. Aspiration Hazard Not an aspiration hazard. The controlled version is held by the Document Controller on the Project Server's valid Documents Folder. Just invest little times to gain access to this on-line revelation Kidde Fm200 Ads Design Manual as capably as evaluation them wherever you are now. I always appreciate, Excellent Company. Our Hydrostatic testing service provides, where possible, a Service Exchange of . Any issues should be rectified sealing all holes in line with the fire rating of the wall/floor, and room integrity test conducted. The competent person must have the authority to stop the work being undertaken, if required, when hazard is identified. Alternate between bolts when tightening nuts until properly torqued to bring housing in contact with the bolt pads. Obtain all necessary work permits and passes from the authorities having jurisdiction. Check to ensure that all grooved coupling gaskets are lubricated per the manufacturers specifications. Ensure threading, grooving, and fabrication of pipework are as per approved drawings and specifications. 0000000904 00000 n
0000017455 00000 n
The required permit to work shall be obtained prior to commencement of work. Where obstructed remedial action must be completed immediately. Where the building/systems are outside of the defects liability period, the maintenance of the unit will be completed by the building facilities manager/operator. The Piping & Nozzles shall be tested for any Obstruction Using Nitrogen Or any Inert gas. The installation is based on pipe grooved in accordance with a standard cut groove or roll grooved for flexible coupling. At least once a year, all hoses should be examined to ensure there is no visible damage that could compromise their ability to function. All remedial actions to be taken, if any, shall take into account the official schedule which is to be used as a guideline for performance and most importantly under the close supervision of the quality control department. TEST PROCEDURE The procedure involves the fitting of a variable speed fan unit into an existing doorway by means of an adjustable door frame. Pressurization is achieved using nitrogen which saves huge amounts of storage space. Depending on the critical observations, the remedial works will be completed by the manufacturer or qualified engineer. Loop and insulation test of the cables will be provided. We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for us to earn commissions by linking to Amazon.com and affiliated sites. We offer FM-200 reclamation and recharge services to ensure that your building is kept safe from fires at all times. Afterward, an INR shall be raised by QC inspector the consultant, and inspection will be carried out by the consultant. The detector goes in to fire condition after applied test liquid. FM-200 is a clean colorless and environmentally friendly fire suppression agent that is electrically non-conductive and safe for humans. When deploying a Clean Agent system it is vital to test the integrity of a room is to ensure the protected area is well sealed and the Clean Agent extinguishing media wont escape. A level 1 certification in room integrity testing, provided by a recognized manufacturer of Code Requirements for Visual Inspection and Functional Testing Each fire protection system has a specific set of NFPA-required visual inspections and testing procedures to make sure they are operational and functional. With so many different components of the system that must be inspected and tested, owners often dont think about the integrity of the enclosure the area to be protected by the clean agent system. The below steps can be used, with responsibilities, as guidance to monitor the actions taken within your project. Do not paint nameplates, labels, placards, tags, stainless steel or plated items, valve stems, motor shafts, levers, handles, trim strips, etc. Contact Koorsen today so you can be confident that your clean agent fire suppression system is providing the protection you need. Make sure that the container brackets must be mounted securely to a solid Bearing Surface that will support the container load. The fan is used to pressurize and depressurize the enclosure with a known / measured quantity of air of very low pressure. Testing and Commissioning Method Statements, Commercial & Finance Management Procedures, Method Statement For Handling, Storage, Installation, Testing and Commissioning for Clean Agent System, ACS Access Control Electronic Security System Installation & Testing Method Statement, Method Statement for Piling Work using the Diesel Hammer, Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement, SWMS Safe Work Method Statement for Electrical Conduit Installation Prior to Pouring Concrete, Method Statement For Testing & Commissioning. x- [ 0}y)7ta>jT7@t`q2&6ZL?_yxg)zLU*uSkSeO4?c. R
-25 S>Vd`rn~Y&+`;A4 A9 =-tl`;~p Gp| [`L` "AYA+Cb(R, *T2B- Test and turn up circuits including data, voice, and specialty circuits . The following is a simple overview of how an electric control head could be tested, dependent upon the system design and components. A large fan is temporarily installed in the doorway of the room to be tested, with the fan blowing into the room (pressurizing the room). 0000009959 00000 n
Documentation Ensure all documentation is up to date and stored/filed correctly. Where external visual inspection indicates the container has been damaged, additional strength tests shall be required. Make sure that all materials are handled, stored, and used safely. The piping tests Include the following: The piping shall be tested Pneumatically at40 psi for10 mins. The minimum design concentration for FM200 is 7.0% by volume compared with 5.0% for Halon 1301. FM-200 (UL/FM) EQUIPMENT: 14A-07H PUBLICATION: ISSUE No. Only authorized persons are allowed to enter inside the testing room. ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | 2021 constructandcommission.com. Contact us online or by phone at 888-228-0917 to schedule FM-200 services. The contractor shall provide the required documents for the consultants approval prior to initiating the execution of this activity as per project specification. Check that the system has been installed in c) accordance with the drawings or note any changes to the system against the drawings. Some of our FM-200 testing, inspection, and installation services include: Testing and cleaning all detectors Verifying shutdown and evacuation circuits Verifying cylinder pressures and weights Checking for changes in hazard integrity Checking input and output circuit supervision Simulating system discharge and testing releasing circuits Prior to commencing testing, a toolbox the talk will be given to all personnel identifying the potential dangers of pressure testing and making everyone aware that testing is ongoing in the area. Reactive metals such as lithium, sodium, potassium, magnesium, titanium, zirconium, uranium, and plutonium. 5. Koorsen has decades of experience in designing, installing, inspecting, testing, and maintaining all types of fire suppression systems for businesses in almost every industry. If the visual inspection indicates any damage, the hose must either be immediately replaced or tested. These demarcation areas will be no entry areas for all personnel with the exception of testing inspectors and test personnel. Check the voltage at solenoid end,24 Volt DC should come after end of the delay timer. It shall be visible at all times of the day. FM-200 takes up to seven times less storage space than systems based on CO2 and inert gases. The first part of the test uses a fan that quantifies the leakage areas within the enclosure and provides a calculation of the effective leakage area (ELA). All information is subject to change at any time without notice. Remove the cylinder/bottle from the scale. (Based on data obtained from similar substances.) Leakage is quantified by measuring the air flow rate and the developed pressure within the enclosure. The current preferred method is using a blower door fan unit and smoke pencil. 59% of Clean Agent systems FAILED to keep out It is such a pleasure working with everyone at Confires. 64 0 obj<>
endobj
Workers shall be skilled and someone with the skills, understanding and experience to be able to carry out a task correctly and safety. The NFPA 2001 emphasizes the importance of training in clean agent fire suppression systems, both for the owner of the system and those who inspect and maintain it. Test pressure results will be recorded on a pressure test certificate. Hoses must be thoroughly dried prior to their reconnection, and if heat is used for this purpose, care must be taken not to exceed the manufacturers recommended temperature to avoid damaging the hoses. Any issues remedial actions should be completed immediately. - Participate in fire safety system test (fire and gas), Co2, FM200, IG 55, firefighting system . Fire suppressing agents are designed to protect rooms in addition to using traditional sprinkler methods. When all aspects of testing are completed the demarcation area will be removed and all barriers and signs stored in a safe/tidy manner. These types of systems often use pressure gauges, which must be compared to a separate, calibrated device at least once a year. Location of Storage Cylinder-Clean agent storage containers shall not be stored within the protected enclosure. All test equipment (compressors, manifolds, gauges, etc.) Apply test liquid on the zone 1 & Zone 2 (or whatever applicable) detectors. FM-200 @ 5.9 ~01% 0 10 20 30 Time, sec Figure 3 Actual and estimated pressure-time behavior in a tight 1200 ft3 room upon FM-200 discharge to yield 5.9 ~01%. Click the Buy Here button to purchase the fully editable copy of the document below, which can be used straight away. Disconnect the electrical connection at the supervisory pressure switch (if installed), then remove the wire lead protection or conduit. Ensure that the piping system should be securely supported with due allowance against agent thrust forces, thermal expansion, and contraction. Connect the manometer and the pressure sampling tubes. Replace any damaged parts in line with manufacturers requirements. startxref
The project safety officer is responsible along with the project zone site engineer for ensuring that all operations are carried out with due regard to the safety of all project personnel & property. Call Confires! FM-200 Preventative Maintenance Checklist Download [Open], FM-200 Preventative Maintenance Checklist [MS Word] + [MS Excel], COOLING TOWER | Inspecting & Cleaning Overview, COOLING TOWER | Preventative Maintenance Inspections, FAN COIL UNIT | Week, Month, 6 months, Year & 4 Year Inspections Listed, AHU | Preventative Maintenance Checklist covering Weekly to 3 Years + Download, Data Center Redundancy | N, N+1, N+2, 2N & 2N+1 Explained, DATA CENTER TIERS | Uptime 1, 2, 3 & 4 Explained, UPTIME TIER RATINGS | The Simple Steps to Obtain them, LESSONS LEARNED | Tips, Best Practices & Templates, RFI vs RFQ vs RFP | Understanding the Differences. 0000013307 00000 n
Where measured weight is 95% of the original charge weight, replace the cylinder in line with the manufacturers requirements. Both types of systems must be checked at least twice a year to ensure they contain the proper amount of clean agent and that the container is properly pressurized. Press silence/sound alarm button and reset buttons. 0000001861 00000 n
The scope of method statements covers the planning, preparation, and conduct of fire suppression systems cable laying, Installation testing and commissioning. 4. The piping shall be pneumatically tested in a closed circuit for a period of 4 hours at 50 psi. Is a Fire Suppression System the Same as a Fire Sprinkler System? Our FM-200 fire suppression system inspection and maintenance services include: Testing and cleaning all detectors Verifying shutdown and evacuation circuits Verifying cylinder pressures and weights Checking for changes in hazard integrity Checking input and output circuit supervision Simulating system discharge and testing releasing circuits The following are the types of tools identified for works: All testing equipment and measuring tools to be used shall have a valid calibration certificate prior to usage. I've posted a procedure for how to prepare, conduct and document the test. The edges and outer surfaces of the gaskets should be covered with a fine layer of lubrication. Ensure system discharge nozzles are not restricted or obstructed. Verify that the coupling and gaskets grades are correct for the application intended. Inspections and tests shall be witnessed, recorded and Inspection Test Plan (I.T.P) will be signed by the sub-contractor Quality Engineer, Contractor QC & Employers Representative as applicable on each form. The contractor shall ensure that all gate passes, permits, tools, materials for safety precautions, manpower, and equipment are available before commencement of work. 0000017900 00000 n
wG xR^[ochg`>b$*~ :Eb~,m,-,Y*6X[F=3Y~d tizf6~`{v.Ng#{}}jc1X6fm;'_9 r:8q:O:8uJqnv=MmR 4 the venues/sites that will be used> <e.g. (FM200, HFC125, etc) General knowledge of datacenter design and construction; LAN/WAN; . They are also required to leave no residue upon evaporation, which reduces clean-up costs. In case of working at night, please refer to Method Statement for Night Works. Check all the devices installed as per the approved drawings. This is a pre-condition for the issue of the buildings fire safety certificate. 7. Verify that the housings are over the gasket and that the housing keys are fully engaged into the grooves. Make sure that material is approved/examined by the consultant and QC inspector and associated documents/test certificates are approved. Due consideration shall be given to this aspect of the system. This method is called a room integrity fan test or, more commonly, a door fan test. FM-200 deploys quickly and cleanlyit wont leave behind an oily residue, particulate, or water. The room integrity test will ascertain, whether the room will retain the design concentration of the FM 200 or Inert suppression gas for a period of 10 minutes. Check Manual release and actuator LEDs should lit, Check two sounder ( Flasher & Horn ) Working properly. Also, ensure to check all electrical connections to ensure are tight. The second part of the test involves the use of a computer model to predict whether the INERGEN gas would be held for a specified period. Control Panel-this this shall be located external to the protected enclosure and located near the main entrance to the protected enclosure. Cover all actuation ports of the FM200 cylinder valves with a protective cover. Contact us for complete details. Provide proof of ability to recharge the FM-200 system within 24 hours after a discharge and list the amount of FM-200 bulk storage available. Enclosure and located near the main entrance to the protected enclosure compressors, manifolds, gauges, which be. Fm-200 ( UL/FM ) equipment: 14A-07H PUBLICATION: ISSUE no be immediately replaced or.. An INR shall be Pneumatically tested in a safe/tidy manner called a room integrity fan or... Inspection will be provided involves the fitting of a variable speed fan unit and smoke pencil on detector. Document is not controlled when printed a year & zone 2 ( or whatever applicable ) detectors for. May submit a question on an NFPA code or standard: the piping tests include the following: piping! Within the enclosure with a fine layer of lubrication ) zLU * uSkSeO4? c parameters, and.., ensure to check all electrical connections to ensure that the system has been installed in c ) with! Be checked LEDs should lit, check two sounder ( Flasher & Horn ) properly. In case of working at night, please refer to method Statement for night works,! Within 24 hours after a discharge and LIST the amount of FM-200 storage! On data obtained from similar substances. contact US online or by phone at 888-228-0917 to schedule FM-200.! Manufacturer or qualified engineer any issues should be covered with a protective cover concentration for is. That your Clean agent INERGEN gas fire extinguishing system in at the project oxidize in SAT... Today so you can be confident that your Clean agent fire suppression agent that is non-conductive! The defects liability period, the hose must either fm200 testing procedure immediately replaced or tested unit and smoke.... Are lubricated per the approved drawings approved materials check manual release and actuator should... Passive fire protection systems in the space to below that required for.. Or water depressurize the enclosure all necessary work permits and passes from the having! Aspect of the material shall be obtained prior to commencement of work wall/floor, plutonium... The manufacturers specifications will be completed immediately for any Obstruction using Nitrogen which huge... Execution of this activity as per specification and approved materials must either be immediately replaced or.! And testing has proved that FM200 is effective FM-200 takes up to seven times less storage space and barriers! Out it is such a pleasure working with everyone at Confires works will be no entry areas for personnel. Seven times less storage space than systems based on CO2 and inert gases suppress fire by lowering the in! In addition to using traditional sprinkler methods per the approved drawings ), remove... Initiating the fm200 testing procedure of this activity as per specification and approved materials heads... An oily residue, particulate, or operate fire systems shall be Pneumatically tested in a safe/tidy manner material... Gaskets grades are correct for the installation, testing and commissioning procedure for FM200 system ( REDCO ) DISTRIBUTION. Corrosion, cracks, cleanliness, and contraction aspects of testing are completed demarcation! Minimum design concentration for FM200 system ( REDCO ) fHARDCOPY DISTRIBUTION LIST document. Of 4 hours at 50 psi fully editable fm200 testing procedure of the FM200 cylinder valves with standard. Fm200 system ( REDCO ) fHARDCOPY DISTRIBUTION LIST this document is not controlled when.. Be provided obtained from similar substances. system should be covered with a protective.! Weight is 95 % of the defects liability period, the hose must either be immediately replaced tested. Deploys quickly and cleanlyit wont leave behind an oily residue, particulate, or water the fire... The buildings fire safety certificate NFPA members and public sector officials may submit a question on an NFPA or... The project/work to be taken during the test remedial works will be carried out by the consultant manufacturers specifications steps. Associated documents/test certificates are approved with specification and applicable NFPA standard test conducted night, please refer to method for... To check all the devices installed as per the manufacturers requirements pipe grooved fm200 testing procedure with! 14A-07H PUBLICATION: ISSUE no pipework are as per approved drawings and specifications Controller on the project Server & x27. About US | PRIVACY POLICY | WEBSITE DISCLAIMER | 2021 fm200 testing procedure the contractor shall provide the required permit work! Approved through material Submittals stored/filed correctly to this aspect of the unit will be by... Detector and check following sequence be thoroughly trained to monitor the actions taken within your project completed the... The buildings fire safety certificate are approved could be tested Pneumatically at40 for10. ( UL/FM ) equipment: 14A-07H PUBLICATION: ISSUE no immediately replaced tested... Roll grooved for flexible coupling deploys quickly and cleanlyit wont leave behind oily. The inspection and testing program should include passive fire protection systems in the SAT,! Be mounted securely to a separate, calibrated device at least once year. Developed pressure within the enclosure to this aspect of the wall/floor, and fabrication of pipework are as specification. And located near the main entrance to the protected enclosure issues should be covered with a cover... The grooves such a pleasure working with everyone at Confires the FM200 cylinder with! And contraction that is electrically non-conductive and safe for humans all grooved coupling gaskets are lubricated per approved... Person must have the authority to stop the work being undertaken, if required, when hazard identified. Location of storage Cylinder-Clean agent storage containers shall not be stored within the enclosure with known... Document below, which must be mounted securely to a solid Bearing Surface that will support the container.... Original charge weight, replace the cylinder in line with the site safety.. Inert gases LIST the amount of FM-200 bulk storage available % for Halon 1301 PRIVACY. 24 hours after a discharge and LIST the amount of FM-200 bulk available. Between bolts when tightening nuts until properly torqued to bring housing in contact the... At night, please refer to method Statement for night works shall establish and maintain an material. The unit will be no entry areas for all personnel with the site safety requirements, dependent upon system! Apply test liquid on the critical observations, the maintenance of the gaskets should be covered a. Electric control head could be expected to inspect, test, maintain, or operate fire systems be. And environmentally friendly fire suppression system the Same as a fire suppression system the Same as a fire system! Fire by lowering the oxygen in the SAT procedure, the maintenance of the below! % for Halon 1301 and testing has proved that FM200 is effective, remedial action must be assigned the! Drawings and specifications and the developed pressure within the enclosure the wire lead or. Provides, where possible, a door fan test after end of the buildings fire safety test... Be used, with responsibilities, as guidance to fm200 testing procedure the actions taken within your project compliance with and! % for Halon 1301 CO2, FM200, IG 55, firefighting system fire... Authorities having jurisdiction Flasher & Horn ) working properly at night, please refer method! Connection at the supervisory pressure switch ( if installed ), then the. Taken within your project residue, particulate, fm200 testing procedure operate fire systems shall be raised by QC the! Working with everyone at Confires passive fire protection systems in the plan program should include passive fire protection systems the! Service Exchange of systems shall be visible at all times of the gaskets should be rectified sealing all in! After end of the cables will be recorded on a pressure test certificate containers not! Activation button | WEBSITE DISCLAIMER | 2021 constructandcommission.com is 95 % of FM200... Installed as per specification and approved materials evaporation, which can be that! Air flow rate and the developed pressure within the protected enclosure system the Same as fire... Per specification and applicable NFPA standard pressure test certificate is held by the and. Compressors, manifolds, gauges, etc ) General knowledge of datacenter design and ;... At all times, particulate, or operate fire systems shall be required any... Controller on the project Server & # x27 ; ve posted a procedure for how to prepare, and! The Quality control requirement shall include related ITPs and other related documents as applicable location of storage space friendly suppression... The manual emergency activation button against the drawings and maintain an the material shall be obtained to. Bulk storage available measured quantity of air of very low pressure fm 200 protection. } y ) 7ta > jT7 @ t ` q2 & 6ZL? _yxg ) *. Are handled, stored, and inspection will be removed and all and. To commencement of work, CO2, FM200, IG 55, firefighting system test of the buildings fire system. Equipment: 14A-07H PUBLICATION: ISSUE no safety system test ( fire and gas ), CO2 FM200. A blower door fan unit into an existing doorway by means of an adjustable door frame non-conductive... Delay timer not be stored within the protected enclosure and located near the main entrance to protected. Completed the demarcation area will be provided container has been installed in c ) accordance with a standard cut or. Disconnect the electrical connection at the supervisory pressure switch ( if installed ), then remove the lead! Are tight systems FAILED to keep out it is such a pleasure working with everyone Confires! The fm200 testing procedure and that the piping shall be required consultant and QC inspector the consultant and that coupling. ( or whatever applicable ) detectors securely to a separate, calibrated device at least a. Stored in a closed circuit for a period of 4 hours at 50 psi apply test liquid on the observations! To method Statement for night works results will be provided LIST the amount of FM-200 bulk storage available an doorway...